CURRENT/RECENT PROJECTS


Knowledge Corridor Underpass Project in Northampton, MA
Massachusetts Bay Transportation Authority precast concrete underpass structure

Southbridge Municipal Airport Apron Repair

NE & NY Gas Piping Work

Main St Bridge Rehabilitation over the Quinebaug River in Southbridge
Massachusetts Department of Transportation rehabilitation and widening of a structurally deficient arch bridge

Klondike Rd Bridge over Cowan Brook in Stamford, VT
Vermont Agency of Transportation bridge replacement


Replacement of NB Bridge Northbound over Tracy Road in Killingly, CT
Connecticut Department of Transportation bridge replacement project involving removal/replacement of the existing bridge superstructure and partial removal/replacement of the substructure.

Off Site Water Mains, Sewer & Drainage for MGM Springfield
Restoration and replacement of 3,000 feet of water, sewer and drainage utilities.

Cargill Falls Hydroelectric Project at Historic Cargill Falls Mill LLC
Rehabilitation of raceway & structure for small power plant.

Needham St Bridge Replacement over Great Ditch in the Town of Dedham
Massachusetts Department of Transportation demolition and reconstruction of NEBT concrete beam bridge.

Modular Toll Building Installation
Massachusetts Department of Transportation installation of precast concrete AETS Tolling Modular Buildings for thirteen sites.

Replacement of the Woodlawn Avenue Bridge over the CSX RR in Pittsfield, MA
Massachusetts Department of Transportation construction of a new single span structure on new precast abutments and cast-in-place footings.

Construction of Harbor Front Walkway and Causeway Park along the Danvers River in Beverly & Salem, MA
Massachusetts Department of Transportation construction of a walkway along the Beverly Harbor Front and a Causeway Park along an abandoned section of the former Route 1A between Bridge Street and the Danvers River in Salem.

Roadway Reconstruction & 2 Culverts on Liberty Street in the Town of Danvers
Massachusetts Department of Transportation project involving demolition of existing culverts and installation of new precast box culverts, wingwalls and a temporary utility bridge for utility operations during construction.

Winter Street Bridge Replacement over CSX & MBTA Railroads in Framingham
Massachusetts Department of Transportation project to demolish the existing two lane 72' long bridge and replace with a new four lane single span bridge.

Bridge Replacement Hopper Road over the Green River in the Town of Williamstown
Massachusetts Department of Transportation project involving demolition of the existing bridge, installation of a temporary bridge and construction of a new 120’ single span bridge with steel girder superstructure.